Welcome To Semiconductor Integrated Display Technology Co., Ltd. Set As Home Page | Join Favorites | Contact Us Chinese | English
 

News report

Your current location:Home >> News >> News report
 
Warmly celebrating on completing of the steel structure of the first stage engineering of the Chen Hong Da Intelligent Technology Industrial estate
2017/10/19 10:35:43 瀏覽次數:1097

   At the morning of September 20, 2017, Chen Hong Da Intelligent Technology Industrial estate liting fireworks, firecrackers, which have marking that the first phase of the standard workshop with the main steel structure are successfully built ,the company president- Zhao Zhengtao,and the functionary of the related item company and related engineering unit have attended the ceremony!




   Chen Hong Da Intelligent Technology Industrial estate project lie is located in Wuhu Yangtze River Bridge in Economic Development Zone, construction land total area is 127,900 m2, the west side of the estate site is branch-1 road, the south is near to the Yangtze River Road, the north close to Ni Bu Road. The estate project is a composite of the R & D center, dormitory and the corresponding standard workshop, warehouse and logistics process requirements of special plant composition.




   At present, the first phase of the project is "standardized plant-one", whch has a construction area of 15,700 m2. It will be medium experimental line factory of our company and is expected to be completed in February in next year.

 
Copyright ©2016  Semiconductor integrated Display Technology Co., Ltd.  Copyright | Anhui ICP No. 09088012 -1 powered by xinganxian technology
yellow资源在线视频高清观看,高中生粉嫩无套第一次,少妇人妻在线无码天堂视频网,免费看很色很黄很爽视频